Work consists of: The Work for this Contract involves excavating a floodplain throughout the Project Site near Willow Creek. This Work also includes demolition of existing pipes, utility lines, and other infrastructure required for the excavation, together with all other Work required to complete the Project as shown on the Drawings and specifications.
Willow Creek Floodplain Improvements must be submitted no later than 2:00 pm, local time, on May 22, 2025. At that time, they will be publicly opened. Bids will not be accepted after this hour and date. Port of Morrow will be acting as the General Contractor for this project.
Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850.
A copy of the scope of work may be obtained on April 18, 2025. Please email Bids [aat} portofmorrow {d0t] com to obtain a copy.