Bid Advertisement: Terminal 1 Dredging & Turn Cell Installation

Terminal 1 Dredging & Turn Cell Installation must be submitted no later than 2:00 pm, local time, on 11/12/2024. At that time, they will be publicly opened. Bids will not be accepted after this hour and date. Port of Morrow will be acting as the General Contractor for this project. 

The proposed project will occur on the Columbia River at River Mile (RM) 269.40 at the Port of Morrow’s existing Terminal 1 Slip. All accumulated sediment within the slip will be dredged down to the existing concrete bottom at elevation 243 (NGVD 29). Approximately 14,000 square feet area will be dredged just outside the slip entrance and down to the same elevation. Approximately 50,000 cubic yards of material will need to be removed. Dredge material will be disposed of in an upland containment basin already constructed directly adjacent to the Terminal 1 Slip. Return water will be treated through a three-stage series of settling ponds before it is discharged back into the river. In addition, one turning dolphin consisting of 3 pilings will be installed approximately 175 feet from the shoreline near the entrance to Terminal 1 to aid barges turning into the slip. The ODFW work window for this reach of the Columbia River is December 1 thru March 31. 

Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850. 

A copy of the scope of work may be obtained on October 11, 2024. Please email Bids [aat} portofmorrow {d0t] com to obtain a copy.

Bid/RFP Reference Number
#11122024
Bid/RFP Due Date