Advertisement for Bid: Farm 4 - 2023 Expansion Project; Monitoring Well Installation

Contractor shall drill, construct, and develop two (and up to three) six-inch diameter monitoring wells with 4-inch diameter pre-packed schedule 40 PVC screens (0.010-inch slots). Anticipated total depths are up to 365 feet.

Farm 4 - 2023 Expansion Project; Monitoring Well Installation must be submitted no later than 2:00 pm, local time, on 2/8/2023. At that time, they will be publicly opened. Bids will not be accepted after this hour and date. Port of Morrow will be acting as the General Contractor for this project.

Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850.

A copy of the scope of work may be obtained on January 25, 2023. Please email Bids [aat} portofmorrow {d0t] com to obtain a copy.

Bid/RFP Reference Number
#02082023
Bid/RFP Due Date